Skip to main content

4.10 Taxi & Shutdown

Objective

To safely taxi from the runway to the gate and perform complete aircraft shutdown while maintaining SOP compliance, passenger comfort, and ground crew safety.


Taxi After Landing

Initial Rollout

PF:

  • Maintain runway centerline
  • Smoothly decelerate using:
    • Autobrake (until 60–80 kt, siehe Landing SOP)
    • Reverse thrust (as required, idle ~70 kt)

PM:

  • Monitor speed and runway clearance
  • Call out speed reductions

Runway Exit

  • Enter taxiway at appropriate speed:
    • High-speed exit: 40 kt target, max 50 kt
    • Tighter turns / standard turns: max 15 kt

PF:

  • Steer via tiller / rudder pedals
  • Maintain smooth control

PM:

  • Monitor external traffic
  • Verify lights and brake status

Taxi to Gate

  • Taxi speed: approx. 20 kt
  • Outside apron: up to 30 kt allowed
  • Follow ATC instructions
  • Maintain situational awareness

Lights:

  • Taxi lights → ON
  • Landing lights → ON
  • Turnoff lights → ON

Approach to Parking Spot / Stand

PF:

  • Align aircraft with stand
  • Reduce speed gradually
  • Apply brakes smoothly

PM:

  • Monitor nose wheel alignment
  • Coordinate pushback if required

Ground Crew Safety:

  • ALL front lights (Taxi, Landing, Turnoff) → OFF
  • Ensure visibility hazards minimized for ground personnel

Parking & Braking

  • Parking brake → SET
  • Aircraft fully stopped

Aircraft Shutdown Procedure

Before Shutdown

PM / PF:

  • Verify systems powered down safely
  • Check fuel, lights, electrical systems

Standard Shutdown Flow

  1. Engines → OFF (Engine Master switches)
  2. APU → ON (if ground power needed)
  3. External Power → CONNECTED
  4. Battery switches → OFF (as required)
  5. Anti-collision lights → OFF
  6. Flight Instruments → Parked / Safe
  7. Parking Brake → SET

After Shutdown

  • Perform walk-around (virtual / checklist)
  • Ensure aircraft ready for next flight
  • Log flight details if required

Key Principles

  • Smooth, controlled taxi to gate
  • Maximum taxi speed 20 kt (30 kt outside apron)
  • All front lights OFF when entering parking stand
  • Follow VA philosophy: passenger comfort & ground crew safety first
  • Shutdown only after full stop and all systems verified

Outcome

  • Aircraft safely at gate
  • Engines off, systems secured
  • Crew ready for debriefing / next flight